Sequence P122 - 01
Stage 01 - Initial Position:
step 01 SLS connected to AS
- Stage 00 - Initial Position:
- Span P124-123 erected & all tendons are stressed
- Span P124-123 on temporary bearings (20mm stroke)
- Span P124-123 is clear (connection beams & PT brackets are removed on top slab)
- Front Support (FS) & Rear Support (RS) loaded
- FS & RS anchored to the bridge by 4 x Ø40mm bars
- Auxiliary Support (AS) fully retracted (0mm stroke)
- SLS connected to AS
- Main Girder (MG) centered on each supports (ecc. = 0)
- Longitudinal fixity pin engaged on RS
Description : Unit : MAX ACCEPTED VAL : MIN ACCEPTED VAL: Read Vlaue :
Description : Unit : MAX ACCEPTED VAL : MIN ACCEPTED VAL: Read Vlaue :
Comments: