Grand Paris Express T2A:

Sequence P122 - 01

Stage 01 - Initial Position:

step 01 SLS connected to AS

 

picture

Description :

Unit :

MAX ACCEPTED VAL :

MIN ACCEPTED VAL:

Read Vlaue :

 

Stage 02: Adjust FS height

step 01: Move AS

 

picture

picture

 

 

step 02: Engage AS

step 03: Unload RS

 

Stage 03:  Move AS to graduation 22

step 01: Adjust FS height

 

 

picture

 

Step 02: Load AS to minimum 30bar

picture

Step 03: Engage longitudinal fixity pin

picture

Sequence P122 - 02

Stage 01:  Adjust FS height (7.065m)

Step 01: Adjust AS height

 

picture

 

 

step 02: Move RS to graduation 31.08m

picture

step 03: Remove longitudinal fixity pin on AS

picture

 

Sequence P122 - 03

Stage 01 - Auxiliary Support (AS)  Position

step 01 Rear Support (RS) loaded

 

picture

 

Stage 02: Adjust FS height

step 01: Move AS

 

picture

 

 

step 02: Engage AS

picture

step 03: Unload RS

picture

 

Stage 03:  Move AS to graduation 22

step 01: Adjust FS height

 

picture

 

 

Step 02: Load AS to minimum 30bar

picture

Step 03: Engage longitudinal fixity pin

picture