Grand Paris Express T2A:

Procedures List:
icon

site preparation:

It is a question of freeing up the space which is located in future construction zones: displacement of buried networks (water, electricity, gas, etc.), demolition of buildings or even archaeological diagnostics.
Release:01 Release Date:30/11/2022 Last Update Date:30/11/2022
Int Unocked By : Ivan Barrows
icon

Preview

icon

Execute

icon

Pause

icon

Lock

icon

Stop

icon

Construction:

Civil engineering works consist of building stations, service structures, viaducts and operations centres. The tunnel boring machines, a 100 meter long machine, dig the tunnels that the metros will use in the underground part of the network.
Release:01 Release Date:01/12/2022 Last Update Date:01/12/2022
Locked Locked By : Susan Dare
icon

Preview

icon

Execute

icon

Pause

icon

Unlock

icon

Stop

icon

Layout and equipment:

The lines are fully fitted out and equipped. Electrical network, signaling, escalators or laying the railway, the various trades are busy installing the equipment necessary for the smooth operation of the metro and the reception of passengers.
Release:02 Release Date:02/12/2022 Last Update Date:02/12/2022
Unlocked Unocked By : Danielle Kub
icon

Preview

icon

Execute

icon

Pause

icon

Lock

icon

Stop

icon

Trials and blank runs:

Tests are carried out to check the adequacy between the infrastructures and the metro. Simulations without passengers, called blank runs, are then carried out to check the proper functioning of the equipment in real conditions.
Release:03 Release Date:03/12/2022 Last Update Date:03/12/2022
Locked Locked By : Amanda Schoen
icon

Preview

icon

Execute

icon

Pause

icon

Unlock

icon

Stop

icon

Commissioning:

Once the tests are completed, the metro lines are gradually put into service and the stations welcome passengers.
Release:01 Release Date:04/12/2022 Last Update Date:04/12/2022
Exe Locked By : Armando Rodriguez